1
stage
100%
The first two houses of the residential complex have been commissioned, and the construction of the third one is underway:
• landscaping works;
• cleaning of the public usage places, cleaning works;
• installation of fire equipment on the roof of the building;
• installation of a fire alarm system in the building;
• laying electrical networks in storerooms;
• laying of Internet cables to the apartments;
• installation of Braille on the railings and tactile tapes on the staircases.