1
stage
100%
The first two houses of the residential complex have been commissioned, the construction of the third one proceeds:
• work on the floor slab on the 10th floor has begun;
• brickwork of ventilation ducts reached the level of 5-6 floors;
• chimneys made of stainless steel screed, have been installed from the basement to the 5th floor;
• masonry of walls and partitions has begun both in the basement and at the level of the first floor.