The first two buildings of the residential complex have been commissioned, the construction of the third building is in progress:
• installation of the horizontal formwork of the floor slab above the parking lot; the reinforcement twisting of the floor slab has begun;
• brickwork of partitions for storerooms in the basement;
• pouring screed on 5-8 floors;
• arrangement of the wet facade of the chimneys on the roof (reinforcement and application of texture);
• the arrangement of the ventilated facade is completed.