October News from NovaBydova

21.04.2017

Dear NovaBydova investors! Please be informed that all apartments of the residential complex “Shchaslyvyi” in Sofiivska Borshchagivka are sold with all appropriate documentation! Apartments with repair, office area and store rooms are available for sale. All houses of the complex have been brought into operation already. Final preparations for the signature of apartments transfer and acceptance certificates by owners of apartments in the house located at 50 Shchaslyva Street will finish soon:

  • Water supply and sewerage are established in the house; water supply system check was conducted.
  • Electricians finish the installation of automatic circuit-breakers and electricity meters.
  • Inside gas piping works, such as standpipes welding, are over.
  • Mail boxes are being hung in entrances.
  • Office and basement premises are ready for use.

The territory near the house is taking some finishing touches on:

  • the playground area is being actively prepared for the installation of playground constructions along with the delivery of stone screening dust;
  • for the landscaping of green zones there have been placed water hoses and ground was brought in and levelled; and
  • garbage bins will be placed right after asphalting is finished.

All works in the house located at 61 Shchaslyva Street near their completion too:

  • gas pipes welding progresses dynamically. Half of boilers is delivered to the house, so gas equipment will be installed in the nearest couple of days.
  • Works on the water disposal system will finish by the end of the week. Sanitary outputs are mounted everywhere.
  • Works on the pouring of cement screed on floors are over in all premises of the building.
  • The installation of doors in section 2 is about to end, the rest are already installed; window sills and water drips are mounted too.
  • Walls puttied and ceilings painted in entrances of all sections.
  • Entrance corridors are being tiled dynamically.
  • Walls plastered and floors tiled in all basement facilities.
  • Perimeter pavement is being laid in the territory of the house 61 (special covering along the external side of the house’s walls to protect the foundation from atmospheric precipitation).

Our residential complex “Shchaslyvyi” affords everything for your careless living. Please make haste if you haven’t signed the prepayment contract for your own apartment with documents yet. Phone numbers of the sales office in Sofiivska Borshchagivka: (044) 223-76-76, (067) 735-76-76. Call right now and get the best apartment design!

Foto