- the area near entrances is being paved with colored paving slabs;
- the roads near the house are being paved too;
- entrances 1, 2, and 3 have been plastered with decorative stucco;
- handrails are being installed in the first two sections;
- entrance lobbies and floors of entrances 4 and 5 are being plastered as well;
- office premises in the basement have been plastered too, soon tile layers will begin their work there;
- facade works at office entrances near their completion;
- the territory of 10-G is being developed: the ground is levelled before planting.
A beauty salon and a flower shop opened in the development this month. Read more about the complex’s infrastructure in this article
https://novabydova.com.ua/en/news/infrastruktura-zhk-shchasliviy-v-petropavlovskoy-borshchagovke/. Dwellers of the RC may further develop their business because basement facilities are intended exactly for that purpose. To purchase such premises call (067) 409-36-36, (067) 990-46-46.
The house with a lake view - 10-D – is constructed completely (construction period from April 2014 to December 2015);
- roof slabs have been laid, works on the mounting of roofing and rainwater runoffs are ongoing;
- tower cranes are being dismounted;
- windows have been installed almost in the entire building, except for apartments of floors 10 and 11.
- plastering works progress well in apartments and entrances of sections 3 and 4;
- sanitary system is being distributed to apartments very fast;
- radiators are being installed;
- facade insulation works will begin in the nearest couple of days.
The entire development was equipped with video surveillance systems.
Traffic lights will be on upon the traffic police approval.
Call our sales offices at (067) 409-36-36, (067) 990-46-46 – you are welcome here! Apartment in the RC “Shchaslyvyi” in Petropavlivska Borshchagivka is a worthy target of a successful person!
Foto