Array
Array
Array
Array
Array
Array
Array
Array
17, Bihova Street
Apartments
210
Floors
16
Development started
september, 2016
Finished
december, 2017
  • Comfort of country houses Comfort of country houses
  • Profitable investment Profitable investment
  • Atmosphere of rest Atmosphere of rest

Technology

The house is built based on the cast-in-place concrete frame technology, which is a long-lasting, reliable, and solid construction method.

Walls

External walls are raised from ceramic bricks (250 mm), insulated by mineral wool (130 mm). Façade: ventilated with composite panels. Triple-layer inter-apartment partition walls (250 mm): gas concrete block 100 mm + mineral wool board 50 mm + gas concrete block 100 mm.

Windows

Metal and plastic 5-chamber dual pane windows with window sills. Frame system – KBE Optima.

Heating

Individual heating in every apartment: Western Quasar double-pressure gas boiler and metal radiators.

Floor view

Apartments in the house at the st. 17, Bihova Street in Lviv

  • Residential properties
  • Commercial property
Number of rooms
Gross area, M²
Type
Gross area, M²
Searching results:
  • Rooms: 1
  • Gross area: 40.5 м2
  • Living space: 19.04 м2
  • Rooms: 2
  • Gross area: 72.18 м2
  • Living space: 35 м2
  • Rooms: 1
  • Gross area: 40.47 м2
  • Living space: 16.33 м2
  • Rooms: 2
  • Gross area: 54.13 м2
  • Living space: 29.92 м2
Construction progress