17-A, Bihova Street
Apartments
210
Floors
16
Development started
february, 2018
Finished
december, 2019
  • Comfort of country houses Comfort of country houses
  • Profitable investment Profitable investment
  • Atmosphere of rest Atmosphere of rest

Technology

The house is built based on the cast-in-place concrete frame technology, which is a long-lasting, reliable, and solid construction method.

Walls

Exterior walls are built of the top-quality red brick. Interior walls are built of gas-concrete blocks. Foam panels are used for the insulation of facades of the houses.

Windows

Metal and plastic 5-chamber dual pane windows with window sills. Frame system – KBE Optima.

Heating

Individual heating in every apartment: Western Quasar double-pressure gas boiler and metal radiators with temperature control.

Apartments in the house at the st. 17-A, Bihova Street in Lviv

  • Residential properties
  • Commercial property
Number of rooms
Gross area, M²
Additionally
Additionally
Type
Gross area, M²
Additionally
Additionally
Searching results:
  • Rooms: 1
  • Gross area: 40.76 м2
  • Living space: 19.18 м2
  • Rooms: 2
  • Gross area: 66.05 м2
  • Living space: 32.19 м2
  • Rooms: 1
  • Gross area: 40.75 м2
  • Living space: 19.13 м2
  • Rooms: 2
  • Gross area: 66.3 м2
  • Living space: 31.87 м2
Construction progress
December
2018
November
2018
October
2018
September
2018
August
2018
July
2018
June
2018
June
2018
May
2018
April
2018
March
2018